PetroCalcHub
Reservoir EngineeringReserves and RecoveryIn-depth reference

Logistic Oil Production Rate Calculator

q(t)=Knt1/2 ntn−1(t1/2 n+tn)2q(t)=\frac{Knt_{1/2}^{\,n}t^{n-1}}{(t_{1/2}^{\,n}+t^n)^2}
Tabular solver

Inputs

4 variables

Saved work stays in this browser. Download a backup from Saved work to protect or share it.

Calculate logistic oil rate consistent with cumulative production. Check exponent-dependent origin behavior and the initial rising-rate branch before use.

Published by PetroCalcHub Team. Linked workflow tools and revision log.

Engineering reference summary

Calculation context and source notes

Evaluate the derivative of a Clark-type logistic cumulative-production curve from its fitted asymptote, half-time and exponent. This is not necessarily a decline-only model: when the exponent exceeds one, rate first rises and subsequently declines.

Use the same K, half-production time, exponent and time origin as the cumulative calculator. Evaluate a supplied fitted curve point in STB/day and examine whether its rising or declining branch matches the interval being studied; the parameters are not fitted from one input point.

Texas A&M Collins thesis: cumulative relation and rate derivation, Appendix E

Solves for

q_t (STB/day)

Locate the rate peak, not just the half-time

For K = 100,000 STB, t_half = 365 days and n = 2, the rate at day 365 is 136.986301 STB/day. The rate peak occurs earlier, at t_half/sqrt(3) = 210.732848 days, with 177.950425 STB/day. Half the cumulative asymptote is reached at day 365, not at the rate peak.

For a general n greater than one, differentiating the rate gives t_peak = t_half[(n - 1)/(n + 1)]^(1/n). That derivation applies only to the positive interior peak. For n at or below one there is no positive interior peak of this kind, so the same expression must not be applied blindly.

Locate the rate peak, not just the half-time
Elapsed time (day)Oil rate (STB/day)
00
210.732848177.950425
365136.986301
73043.835616

Handle the origin and the time basis

At zero time, n greater than one gives zero rate and n equal to one gives K/t_half. An exponent between zero and one gives a divergent rate even though cumulative production starts at zero. The calculator reports that singular origin as an input error instead of fabricating a finite rate.

If times are rescaled to a unit containing c days, both t and t_half must be divided by c; the numerical rate per new time unit becomes c times the daily rate. Cumulative production remains unchanged. The interface keeps a daily basis, while the regression suite checks that this unit transformation and the cumulative derivative agree.

Related source-backed guides

Formula reference

Formula, variables, and default calculation

q(t)=Knt1/2 ntn−1(t1/2 n+tn)2q(t)=\frac{Knt_{1/2}^{\,n}t^{n-1}}{(t_{1/2}^{\,n}+t^n)^2}

Reproducible default result

With the default values shown below, the calculation returns q_t = 136.986301 STB/day. Defaults demonstrate the implementation; they are not recommended field values.

KSTB

100000

t_halfday

365

ndimensionless

2

tday

365

Input definitions

K

STB

Fitted Cumulative Asymptote (Not Verified Reserves)

t_half

day

Time to Half of the Fitted Asymptote

n

dimensionless

Positive Growth Exponent (Origin Singular Below 1)

t

day

Elapsed Time from the Fitted Origin

Output definitions

q_t

STB/day

Modeled Oil Production Rate

Engineering use, assumptions, and limits

Use the same K, half-production time, exponent and time origin as the cumulative calculator. Evaluate a supplied fitted curve point in STB/day and examine whether its rising or declining branch matches the interval being studied; the parameters are not fitted from one input point.

Assumptions

  • The cumulative asymptote, half-time and exponent belong to one consistent empirical fit.
  • Elapsed time and half-time use days, while the cumulative amplitude uses stock-tank barrels.

Limitations

  • This is a rate evaluator, not a production-history regression, operational model or reserves estimate.
  • For 0 < n < 1 the origin is singular and requires a positive elapsed time; a rising-rate branch must not be mistaken for monotonic decline.

Common mistakes

  • Treating K in STB as an initial daily rate, or assuming t_half is the time of the rate peak.
  • Evaluating zero time with n below one, or using parameters from a differently normalized cumulative curve.

Frequently asked questions

What inputs does the Logistic Growth Oil Production Rate calculator need?

The calculation uses Fitted Cumulative Asymptote (Not Verified Reserves) (K), Time to Half of the Fitted Asymptote (t_half), Positive Growth Exponent (Origin Singular Below 1) (n), Elapsed Time from the Fitted Origin (t). Enter values on the units shown beside each field.

What result does this calculator return?

The primary result is modeled oil production rate in STB/day. The formula section shows the declared relationship, variables, and a reproducible default calculation.

What should I check before using the result?

Confirm the unit basis, source applicability, and input quality. This is a rate evaluator, not a production-history regression, operational model or reserves estimate. Treating K in STB as an initial daily rate, or assuming t_half is the time of the rate peak.

Source and record status

Source metadata identifies the relationship implemented by the calculator. Check the cited edition, unit basis, and scope against the engineering case before operational use.

reviewedguidance published

Decline-Curve Analysis for Gas Wells, T. A. Blasingame (2016)

T. A. Blasingame, Texas A&M P613 Lecture 8 (2016), slide 36: logistic-growth rate a K n t^(n-1)/(a+t^n)^2. The time parameter here is a = t_half^n.

Open source reference