PetroCalcHubFree
Drilling EngineeringWell ControlIn-depth reference

Kill Weight Mud Determination - Moore Equation Calculator

KWM=SIDPP0.052TVD+OMWKWM=\frac{SIDPP}{0.052TVD}+OMW

Enter original mud weight, shut-in drillpipe pressure, and true vertical depth. The calculator returns the estimated kill mud weight.

Tabular solver

Inputs

Defaults provide a quick field-unit example for the equation.

3 variables

Your input values and calculation stay in this browser.

Engineering reference summary

Calculation context and source notes

Kill weight mud determination estimates the mud density required to balance formation pressure after a kick using original mud weight, shut-in drillpipe pressure, and true vertical depth.

Use it as a well-control arithmetic check when shut-in pressure has stabilized and the approved procedure calls for a kill mud weight calculation.

Solves for

KWM (ppg)

Related source-backed guides

Formula reference

Formula, variables, and default calculation

KWM=SIDPP0.052TVD+OMWKWM=\frac{SIDPP}{0.052TVD}+OMW

Reproducible default result

With the default values shown below, the calculation returns KWM = 12.961538 ppg. Defaults demonstrate the implementation; they are not recommended field values.

SIDPPpsi

500

OMWppg

12

TVDft

10000

Input definitions

SIDPP

psi

Shut-In Drill Pipe Pressure

OMW

ppg

Original Mud Weight

TVD

ft

True Vertical Depth

Output definitions

KWM

ppg

Kill Weight Mud

SIDPP

psi

Shut-In Drill Pipe Pressure

OMW

ppg

Original Mud Weight

TVD

ft

True Vertical Depth

Engineering use, assumptions, and limits

Use it as a well-control arithmetic check when shut-in pressure has stabilized and the approved procedure calls for a kill mud weight calculation.

Assumptions

  • Shut-in drillpipe pressure is stabilized and representative of formation overbalance needed.
  • True vertical depth is used for the pressure-gradient conversion.
  • The calculation follows the field-unit relationship used by the source equation.

Limitations

  • Does not replace a complete kill sheet, choke schedule, or well-control method.
  • Does not account for gas migration, subsea choke-line friction, changing hydraulics, or operational safety factors.

Common mistakes

  • Using shut-in casing pressure where shut-in drillpipe pressure is required.
  • Using measured depth instead of true vertical depth.
  • Treating the computed mud weight as approved without checking company and regulatory well-control requirements.

Source and record status

Source metadata identifies the relationship implemented by the calculator. Check the cited edition, unit basis, and scope against the engineering case before operational use.

reviewedguidance published

Lapeyrouse, N.J. 2002. Formulas and Calculations for Drilling, Production and Workover, 2nd Edition, Page 131.

Open source reference