Curves matched at the initial rate and the first-year endpoint can still have different long-term tails. Matching two observations does not identify a unique decline model.

By PetroCalcHub Team · Updated October 24, 2026 · Free to read and use

Match the first-year condition explicitly

The study fixes qi = 1,000 STB/day and q at day 365 to 700 STB/day. For each selected b, Di is solved so that the endpoint condition is exactly satisfied.

This differs from the basic model comparison that holds Di fixed. Here the fitted initial decline changes with b, because matching the same endpoint requires it.

Compare what was not used for matching

At later times the models separate despite agreeing at the two matched points. Those later predictions reveal tail sensitivity that the first-year condition cannot constrain.

The table also reports cumulative production at the selected horizon. Rate endpoint agreement does not imply equal area under the curves even during the matched first year.

Interpret the study as nonuniqueness

No field observations are used and no family is declared more accurate. A real forecast would require additional history, physical context and a terminal rule.

The downloadable data include each b and its derived Di so the matched condition can be reproduced rather than assumed.

Explore the example

Original synthetic teaching calculation. Equations and fixed controls are stated here; these are not field measurements.

365

Select one of 5 recorded scenarios. Intermediate states are not interpolated.

Selected scenario

Elapsed time (day) = 365. Exponential rate (STB/day): 700; Hyperbolic b=0.5 rate (STB/day): 700; Harmonic rate (STB/day): 700.

Selected result05001,00001,8303,650Scenario input
  • Exponential rate (STB/day)
  • Hyperbolic b=0.5 rate (STB/day)
  • Harmonic rate (STB/day)
Exponential rate (STB/day) versus Elapsed time (day). Green marks the selected row. Lines connect recorded points for orientation; exact solved values are tabulated below.

Worked example

Matched first-year endpoint, different tails

qi = 1,000 STB/day; all curves match 700 STB/day at day 365. Derived daily Di values for b 0, 0.5, 1: 0.000977191627, 0.0010697458, 0.0011741683.

Relation and unit basis

q = qi exp(−Dit) for b = 0; q = qi(1 + bDit)^(−1/b) otherwise

Time in days, rate in STB/day. b = 1 is harmonic. These are synthetic model curves, not field fits.

  1. 1. Define the baseline

    Elapsed time (day) = 365

    qi = 1,000 STB/day; all curves match 700 STB/day at day 365. Derived daily Di values for b 0, 0.5, 1: 0.000977191627, 0.0010697458, 0.0011741683.

  2. 2. Select the relation

    q = qi exp(−Dit) for b = 0; q = qi(1 + bDit)^(−1/b) otherwise

    Time in days, rate in STB/day. b = 1 is harmonic. These are synthetic model curves, not field fits.

  3. 3. Substitute the values

    At day 365 each derived Di makes q/qi = 0.7, so q = 700 STB/day.

    Retain intermediate precision. The displayed values are rounded only after evaluation.

  4. 4. Read the result

    Exponential rate (STB/day) = 700; Hyperbolic b=0.5 rate (STB/day) = 700; Harmonic rate (STB/day) = 700

    Matching one endpoint does not fix the intervening integral or the later tail.

Result and interpretation

Exponential rate (STB/day) = 700; Hyperbolic b=0.5 rate (STB/day) = 700; Harmonic rate (STB/day) = 700

Matching one endpoint does not fix the intervening integral or the later tail.

Compare later rates after checking that every model gives exactly 700 STB/day at day 365.

Study data and reproduction

Original synthetic teaching calculation. Equations and fixed controls are stated here; these are not field measurements.

Exact recorded values for Matched first-year endpoint, different tails. Units are included in the headers.
Elapsed time (day)Exponential rate (STB/day)Hyperbolic b=0.5 rate (STB/day)Harmonic rate (STB/day)
01,0001,0001,000
365700700700
730490517.2312538.4615
1,825168.07256.0727318.1818
3,65028.24752114.7316189.1892

Scroll the table to see all columns. The highlighted row is the worked baseline. Downloads retain full numerical precision.

Test your understanding

Work through the question before revealing its answer. Use the stated assumptions and include units in every numerical step.

  1. 1. If two curves match the first-year endpoint, must their first-year cumulative production agree?

    Show the worked answer

    No. Different shapes between the endpoints can have different integrals.

  2. 2. Reproduce the baseline Exponential rate (STB/day) without rounding intermediate values.

    Show the worked answer

    At day 365 each derived Di makes q/qi = 0.7, so q = 700 STB/day.. Exponential rate (STB/day) = 700. Matching one endpoint does not fix the intervening integral or the later tail.

  3. 3. Compare the first and last recorded scenarios. Which input changes?

    Show the worked answer

    Elapsed time (day) changes from 0 to 3650. Other controls remain as stated in the premise. Exponential rate (STB/day) changes from 1000 to 28.2475249.

  4. 4. What would be needed to apply this example to a different physical system?

    Show the worked answer

    Replace the synthetic controls with compatible documented inputs and check the relation's assumptions. Time in days, rate in STB/day. b = 1 is harmonic. These are synthetic model curves, not field fits. Matching one endpoint does not fix the intervening integral or the later tail.

Before using the result

  • Solve Di separately for each b.
  • Check the matched endpoint.
  • Do not rank synthetic tails as field accuracy.

Matching one endpoint does not fix the intervening integral or the later tail.

Continue in the calculator with your documented inputs →

Continue learning

Start with the broader workflow guide

Sources and method

The explanation and synthetic examples are original PetroCalcHub teaching material. The references below support the definitions and model context. They do not supply field validation for the synthetic scenarios.

Report a correction · Read the calculation review method