PetroCalcHubFree
13 indexed pages

Drilling Operations and Economics Equations

Browse 13 drilling operations and economics petroleum engineering equations with formulas, inputs, outputs, units, and sources.

Drilling operations and economics calculations support penetration-rate checks, bit-run cost per foot, D-exponent surveillance, drilled-gas screening, rotating-power diagnostics, and specific-energy tracking.

13
Formulas
Free
No sign-in
Sources
Reviewable
Drilling EngineeringDrilling Operations and Economics

Bit Run Drilling Cost per Foot

CT=B+CR(t+T)FC_T=\frac{B+C_R(t+T)}{F}
View formula
Drilling EngineeringDrilling Operations and Economics

Control Drilling Maximum Drilling Rate

MDR=67(MWoMWi)qDh2MDR=67(MW_o-MW_i)\frac{q}{D_h^2}
View formula
Drilling EngineeringDrilling Operations and Economics

D-Exponent from Drilling Parameters

d=log[R/(60N)]log[12Wk/(1000Db)]d=\frac{\log[R/(60N)]}{\log[12W_k/(1000D_b)]}
View formula
Drilling EngineeringDrilling Operations and Economics

Detailed Drilling Cost per Foot

Cd=Cb+Cto+Cm+(Td+Tt+Tc)(Cr+Cs+Ctr)FTdC_d=\frac{C_b+C_{to}+C_m+(T_d+T_t+T_c)(C_r+C_s+C_{tr})}{FT_d}
View formula
Drilling EngineeringDrilling Operations and Economics

Drill-Rate Model Penetration Rate

R=K(Wdb)aWNaNR=K\left(\frac{W}{d_b}\right)^{a_W}N^{a_N}
View formula
Drilling EngineeringDrilling Operations and Economics

Drilled Gas Entry Rate

qgsc=db2RϕSgp310zTq_{gsc}=\frac{d_b^2R\phi S_gp}{310zT}
View formula
Drilling EngineeringDrilling Operations and Economics

Gas Mud Ratio from Drilled Gas

rm=db2RϕSgp310zTqmr_m=\frac{d_b^2R\phi S_gp}{310zTq_m}
View formula
Drilling EngineeringDrilling Operations and Economics

Gas Portion Entry Rate from Rock Removal

qg=qrϕSgq_g=q_r\phi S_g
View formula
Drilling EngineeringDrilling Operations and Economics

Hydromechanical Specific Energy

HMSE=WOBAb+120(3.142)NT+1154ηPbQAbROPHMSE=\frac{WOB}{A_b}+\frac{120(3.142)NT+1154\eta P_bQ}{A_bROP}
View formula
Drilling EngineeringDrilling Operations and Economics

Mechanical Specific Energy

MSE=WOBAb+120πNTAbROPMSE=\frac{WOB}{A_b}+\frac{120\pi NT}{A_bROP}
View formula
Drilling EngineeringDrilling Operations and Economics

Rock Removal Rate from Bit Diameter and ROP

qr=db2R11000q_r=\frac{d_b^2R}{11000}
View formula
Drilling EngineeringDrilling Operations and Economics

Rotary-Speed Drill-Rate Model Penetration Rate

R=KNaNR=K'N^{a_N}
View formula
Drilling EngineeringDrilling Operations and Economics

Rotating Horsepower from Torque and Speed

RHP=TN5252RHP=\frac{TN}{5252}
View formula