PetroCalcHubFree
Drilling EngineeringDrilling HydraulicsCalculation record

Bit-to-Surface Lag Time from Annular Volume Calculator

tlag=VAVPOSPMt_{lag}=\frac{V_{AV}}{PO\cdot SPM}

Enter the declared drilling engineering inputs below to solve t_lag. Variable definitions, units, the default calculation, and the available source trail are included on this page.

Tabular solver

Inputs

Defaults provide a quick field-unit example for the equation.

3 variables

Your input values and calculation stay in this browser.

Extended guidance in preparation

What is available in this record

This record provides the functioning calculator, formula, declared variables and units, a reproducible default result, and the available citation metadata. A separately written engineering interpretation has not yet been published for this calculation.

Formula reference

Formula, variables, and default calculation

tlag=VAVPOSPMt_{lag}=\frac{V_{AV}}{PO\cdot SPM}

Reproducible default result

With the default values shown below, the calculation returns t_lag = 42.301166 min. Defaults demonstrate the implementation; they are not recommended field values.

V_AVbbl

378.9

PObbl/stk

0.0914

SPMstrokes/min

98

Input definitions

V_AV

bbl

Annular Volume

PO

bbl/stk

Pump Output per Stroke

SPM

strokes/min

Pump Speed

Output definitions

t_lag

min

Lag Time

V_AV

bbl

Annular Volume

PO

bbl/stk

Pump Output per Stroke

SPM

strokes/min

Pump Speed

Source and record status

Source metadata identifies the relationship implemented by the calculator. Check the cited edition, unit basis, and scope against the engineering case before operational use.

reviewed

DrillingFormulas. Lag Time for Drilling Business and How to Calculate Theoretical Lag Time; AAPG Wiki Wellsite Math.

Open source reference