Casing Displacement Volume to Float Collar Formula

Vdisp=CcsgLfcV_{disp}=C_{csg}L_{fc}

Casing Displacement Volume to Float Collar calculates displacement volume to float collar for mud and cementing workflows in drilling engineering.

Calculate

How engineers use this formula

Use this formula when the listed inputs (C_csg, L_fc) are known and the assumptions behind the cited mud and cementing relationship match the engineering case being checked.

Assumptions

  • Input values are representative for the well, reservoir, fluid, or equipment case being evaluated.
  • The declared units match the field-unit constants used in the formula.
  • The cited formula applies to the selected petroleum engineering workflow.

Limitations

  • The calculation does not replace a full engineering model or operating procedure.
  • Accuracy depends on the source correlation, assumptions, input quality, and unit consistency.

Common mistakes

  • Mixing unit systems without converting the inputs.
  • Using default example values as field recommendations.
  • Applying the formula outside the source assumptions.

Default example

Using the default inputs, V_disp equals 332.9536 bbl.

C_csgbbl/ft

0.03716

L_fcft

8960

Inputs

C_csg

bbl/ft

Casing Capacity

L_fc

ft

Length to Float Collar

Outputs

V_disp

bbl

Displacement Volume to Float Collar

C_csg

bbl/ft

Casing Capacity

L_fc

ft

Length to Float Collar

Source and review

reviewed

DrillingFormulas.com. Calculate Cement (Oil Well Cement) Volume Required; Drilling Manual. Cementing Calculations - 7 Steps & Spreadsheets.

Source

Related formulas and calculators

Hydrostatic Pressure from Mud Weight
Well Control
Surface Pressure During Drill Stem Test
Well Control
Specific Gravity to Fluid Weight
Well Control
Kick Analysis - Influx Density
Well Control
Kick Analysis - Formation Pressure With Well Shut-In
Well Control
Kick Analysis - Shut-In Drill Pipe Pressure
Well Control