Production EngineeringInjection Wells
Voidage Replacement Ratio
Tabular solver
Run the same equation across multiple cases and compare results in one table.
| Case | W_iSTB | B_wirb/STB | G_iMscf | B_ginjrb/Mscf | N_pSTB | B_orb/STB | W_pSTB | B_wprb/STB | B_grb/Mscf | GORMscf/STB | R_sMscf/STB | Result | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Pending | ||||||||||||
| 2 | Pending | ||||||||||||
| 3 | Pending |