Reservoir EngineeringMaterial Balance and Production
Pore Volume Occupied by Injected Gas and Water
Tabular solver
Run the same equation across multiple cases and compare results in one table.
| Case | W_INJSTB | B_wbbl/STB | G_INJSCF | B_GINJbbl/SCF | Result | Action |
|---|---|---|---|---|---|---|
| 1 | Pending | |||||
| 2 | Pending | |||||
| 3 | Pending |