Reservoir EngineeringMaterial Balance and Production
Hydrocarbon Pore Volume Occupied by Remaining Oil
Tabular solver
Run the same equation across multiple cases and compare results in one table.
| Case | NSTB | N_pSTB | B_obbl/STB | Result | Action |
|---|---|---|---|---|---|
| 1 | Pending | ||||
| 2 | Pending | ||||
| 3 | Pending |